Basement renovations

VancouverBasementRenovations

The lower level is floor area you have already paid for. Whether it becomes living space is decided by height, daylight, water and what the code asks of a room people sleep in.

Over 20 years
Working in Vancouver and the Lower Mainland
Licensed and insured
British Columbia
Design, permits, build
One company from the drawings to handover

Below grade, the rules change

A basement is not a cheap extra floor. It comes with conditions of its own: head height that cannot easily be raised, daylight that must be brought in rather than let in, ground water outside the wall. The code asks more of a room someone sleeps in than of a room they watch television in.

So the survey comes first. We measure the height you actually have under the beams and the ducting, and look at the drainage and the signs of damp. That establishes what the space can legally be — a family room, a bedroom, a suite — before anything is drawn.

What is the lower level for?

Lower-level bedroom with a dark upholstered bed and fitted wardrobes, with a bathroom through the doorway

What a lower level needs before it is a room

Everything that makes a basement feel like a basement has a cause, and all of them are fixable in a different order and at a different cost.

  • Head heightWhat you actually have under the beams, the ducting and the drain runs, and which of those can be moved rather than lived with.
  • Daylight and getting outLarger windows and light wells, which is also how a bedroom below grade meets the requirement for a way out.
  • Warm, dry and quietInsulation at the walls and the slab, and separation so the room above is not listening to the room below.
  • Heating and airA lower floor that is heated and ventilated on its own terms instead of taking what is left over from upstairs.
  • A bathroom or a kitchen down thereA wet room below the main drain is the thing that decides whether a suite is possible, so it is checked before it is drawn.
  • Storage that stays storageBuilt-in and kept, because a basement that finishes with nowhere for the bikes fills up with them again.
Lower-level living room with a wall-mounted television, a curved open stair and a glass balustrade

How the lower level gets built

Media room with two rows of reclining seats, a recessed lighting cove and a lit stair at the side
Design, planning and permits
2 to 4 months

The first stage decides whether the rest is a renovation or a structural project, which is why it happens before anything is designed.

  1. Stage 01

    Survey the conditions

    Height, damp, drainage and what the code allows.

    We measure the real head height, check the perimeter drainage and look for the signs of water that matter. That survey is what tells you whether a bedroom or a suite is on the table at all.

  2. Stage 02

    Design and permits

    A plan that meets the code, drawn once.

    Layout, window and light-well positions, insulation and the mechanical plan are drawn together, because each of them eats into head height. The permit application is made from the same set.

  3. Stage 03

    Dry it out, then build it back

    Water, insulation and framing before finishes.

    Drainage and damp are dealt with first, then framing, insulation, services and acoustic separation. Inspections are booked and attended as the stages close.

  4. Stage 04

    Finishes and handover

    Floors, millwork, light, then a walk-through.

    Flooring, millwork, lighting and stairs are finished and corrected, everything is tested, and we walk the level with you before you start moving things into it.

What decides whether a basement works

Two houses on the same street can give completely different answers here, and all five of these are settled at the survey rather than on site.

Bright basement family room with white oak floors and a walnut media wall

Water, inside and out
Perimeter drainage, the grade around the house and any history of seepage. This is dealt with before insulation, never after it.

The height you have
Lowering a slab or underpinning to win head height is a foundation project, not a basement one, and it changes the job entirely.

What the room is allowed to be
A bedroom and a self-contained suite each carry their own requirements for height, light, a way out and separation. What you want it to be sets the budget.

What the old foundation shows
Movement, old repairs and a slab poured without a membrane under it are normal findings in an older Vancouver house, and they are found by looking.

The specification
Flooring, millwork, lighting and whether there is a second kitchen or bathroom down there. The same shell finishes several different ways.

Questions about basement renovations

  • It depends on the scope and on whether any structural or drainage work is needed before the build starts. You get a dated timeline before work begins, and it is updated as the stages close.

  • Yes. We prepare and submit the permit application, and build to the requirements for a basement that is lived in: ceiling height, a way out, separation and ventilation. The inspections are booked and attended as part of the job.

  • That depends on ceiling height, a compliant way out, fire and sound separation, parking and what the zoning allows on your lot. It is checked at the survey, before design work starts, so you are not designing something that cannot be approved.

  • In most cases yes, because the work is contained below the main floor. We agree access, dust control and the stair route with you at planning.

  • It varies widely with the size, the condition of the foundation and whether the lower level becomes a suite. We put a detailed, itemised proposal in front of you before anything begins.

Something not answered here?

Vancouver office, by appointment only.

Find out what your lower level can be

Measure the height at the lowest duct and tell us what you want down there. We will tell you what is possible before anyone draws anything.

Steven Kwok, CAS Developments(778) 909-8321

Step 1 of 4 · Project

Every field is required unless its label says optional.

What are you planning?
We only use your details to reply about your project.

Prefer to send a note? Contact page

CallBook consultation