Kitsilano is mostly pre-war houses on narrow lots, and a lot of them have already been divided once. What that means for your renovation is specific, and it starts with the structure.
In this neighbourhood
- Housing stock
- Craftsman bungalows and character houses from the 1920s and 1930s, many already divided
- Lots
- Narrow, with a lane behind most of them
- The usual first question
- Whether the lower floor has the ceiling height a legal suite needs
- Over 20 years
- Across Vancouver and the Lower Mainland
- Licensed and insured
- British Columbia
- Drawings and permits
- Prepared, filed and followed through by CAS
What Kitsilano houses are made of
Three builds account for most of the street, and each one asks for something different. Which one you own decides where the budget goes.
1910s to 1930s
Craftsman bungalows
Fir floors, boxed beams, panelled trim and a kitchen shut off behind two doors. The value is in the joinery, so the first decision is what stays. Opening the main floor here is structural work in a small footprint: the wall you want gone is usually holding the roof up.
1920s to 1940s
Character houses, already split
Houses here were often divided into an upper and a lower unit long ago, sometimes without a permit. Legalising what is already there is a different job from building a suite: ceiling height, egress windows, fire separation and separate metering are measured before anything is drawn.
1950s to 1960s
Post-war houses on bigger lots
The later houses are plainer and easier to open up, and some sit on lots wide enough for a laneway house under the current R1-1 rules. The trade is the envelope: single glazing, thin wall insulation and a service panel sized for a smaller house.
What the work usually is here
The same service list, ordered the way Kitsilano actually uses it. Each one opens the page with the full detail.
Kitchen RenovationsOpening a shut-in kitchen into the living and dining space, with new structure over the gap.
Basement RenovationsBringing an existing lower unit up to code, or building the first legal one.
Full Home RenovationsTaking a character house back to the studs and replacing the systems while the walls are open.
Heritage RenovationsWorking out what the City protects on your street before the drawings commit to anything.
Laneway HousesChecking whether the lot and the lane behind it will carry a second small house.
What the City asks for
Kitsilano sits inside the City of Vancouver, and every trade is a separate filing with its own review. CAS prepares the package and answers the reviewer.
- Separate filings
- Building, electrical, plumbing and mechanical each go in on their own, and each gets inspected on its own.
- Character retention
- Some streets sit inside a character area. What that allows is checked against your address, not against the neighbourhood.
- Secondary suites
- Ceiling height, egress windows, fire separation and separate electrical metering are all set by bylaw rather than by preference.
- Design, planning and permits
- 2 to 4 months
- Construction, full home
- 4 to 8 months

The work you can look at
We have no Kitsilano project to show you. These three are real CAS work, and the caption on each says where it is.
What moves the number on a Kitsilano house
No price list, because nothing on it would survive your floor plan. These are the five things that actually change the figure here.
- Which wall
- A partition comes out in a day. A bearing wall needs a beam, posts carried down to new footings, and an engineer.
- Ceiling height below
- A lower floor already at height is a suite. One that is short is a dig, and a dig is a different project.
- What is behind the plaster
- Knob-and-tube wiring, galvanized supply pipe and no wall insulation are all normal in a house of this age.
- What has to stay
- Keeping fir floors and original trim costs labour. Replacing them costs the thing that made the house worth buying.
- Access
- A narrow lot and a shared lane decide where the bin, the saw and the lumber can physically sit.
The estimate comes after the drawings, not before them. That order is what stops a figure from moving twice.

Questions about renovating in Kitsilano
Vancouver office, by appointment only
(778) 909-8321Ask about your addressYes. Most of the houses here are pre-war, and character work is a service in its own right at CAS. The first step is finding out what the City protects at your address, which is not the same from one street to the next.
Often, yes. It depends on ceiling height, the egress window, the fire separation between the units and whether the electrical can be metered separately. All four get measured before anyone says anything definite.
Design and permits usually take 2 to 4 months. Construction on a full home usually takes 4 to 8 months. A single room is shorter. The City's review queue is the one part of that nobody controls.
Yes. The building, electrical, plumbing and mechanical filings are prepared, submitted and followed through to final inspection by CAS, along with the drawings and engineering they need.
Not a project we can show you. The three CAS projects with photographs are in Fairview, downtown Vancouver and Dunbar, and each one is named on its own page. We would rather say that than put an unrelated photograph under a Kitsilano heading.
Talk to us about the house
Tell us the address and what is frustrating about the layout. The first conversation is a walk-through and a straight answer about what the structure allows.
Book free consultationWho you would be talking to
Steven Kwok, CAS Developments(778) 909-8321