Point Grey, Vancouver

Home Renovation in Point Grey

Point Grey houses tend to be large, old, and close to a heritage or character constraint. Here the limit is usually the review, not the lot.

In this neighbourhood

Housing stock
Large pre-war houses and mid-century properties, some with a heritage listing
What can gate a permit
A heritage listing, a character area, or an engineering review on pre-1940 framing
The usual first question
What the City protects at this address, before anything is drawn
Over 20 years
Across Vancouver and the Lower Mainland
Licensed and insured
British Columbia
Drawings and permits
Prepared, filed and followed through by CAS

What a Point Grey house asks for

Fewer house types than Kitsilano or Dunbar, and bigger ones. That pushes the scope towards whole floors rather than single rooms.


  1. Pre-1940

    Large character houses

    Formal room proportions, period millwork, fir floors, sometimes an exposed beam ceiling, and a plan drawn around rooms that were meant to stay separate. Opening it up means deciding which of those rooms is allowed to stop existing.

    Load-bearing changes in a house this old usually need an engineering assessment, because what the original framing is doing is rarely obvious from the drawings that survive.

    Scope tends to be a floor or the whole house, not one room.


  2. 1950s to 1970s

    Mid-century properties

    Lower, more glazed, and usually planned around a view or a garden rather than a street. These renovate well, because the structure is simpler and the openings are already large.

    The weak points are the envelope and the services: single glazing, thin insulation and a panel that was never asked to run a modern kitchen.

    Glazing, insulation and electrical capacity usually lead the budget.


  3. Any era

    The lot

    Point Grey lots are among the larger ones on the west side, and many have rear lane access. That makes a second-storey addition, a rear extension or a laneway house a real option rather than a theoretical one.

    What it does not do is shorten the review. A bigger lot does not exempt a house from a heritage or character check.

    An addition is often easier here than a reconfiguration.

Row of character houses with gabled roofs, deep porches and clipped hedges under an overcast sky

What can sit in front of a permit

Point Grey is the one of these three areas where the review itself can set the schedule. These are the three things that do it.


Heritage listing
A house on the Vancouver Heritage Register can need a Heritage Alteration Permit before structural changes are approved.

Character area
Some streets fall inside a character retention area, which governs what is allowed to come off the front of the house.

Engineering assessment
Pre-1940 framing gets assessed before a bearing element is modified, because the original drawings rarely show what is actually there.

Design, planning and permits
2 to 4 months
Construction, full home
4 to 8 months

What we check before quoting

We have no Point Grey project to show you. What we can show you is the work that happens before a number exists.

  • The listing and the zoneThe Heritage Register, the character area map and the current R1-1 rules, read against your address rather than the neighbourhood.
  • The framingWhat is actually carrying the floor above, which on a pre-war house is a question for an engineer and not a tape measure.
  • The servicesThe panel, the supply pipe, the heating and the state of the insulation, because these decide whether a wall opens once or twice.
  • What has to surviveThe millwork, the floors and the proportions you would not want replaced, written down before design starts rather than during it.
  • The sequenceWhich rooms can be lived in while the others are worked on, which on a house this size is often the deciding factor.
Architectural drawings laid out, floor plans and elevations overlapping

Work we can show you

Not in Point Grey. This is a detached house in Vancouver that CAS renovated, photographed room by room, and the caption says where it is.

White shaker kitchen with a centre island, quartz counters and stainless appliances
Fairview home renovation · Vancouver

Fairview · Detached house

Fairview Home Renovation

Full home · Kitchen · Bathroom

Questions about renovating in Point Grey

Vancouver office, by appointment only

(778) 909-8321Ask about your address
  • Yes, it is a service in its own right at CAS. The first job is establishing what applies to your property: a Heritage Register listing, a character retention area, or neither. That answer changes the design before it changes the budget.

  • Not on a project we can show you. The three CAS projects with photographs are in Fairview, downtown Vancouver and Dunbar, and each one is named on its own page.

  • Often, on a Point Grey lot. It depends on the existing foundation and framing, the height and setback rules for the zone, and whether the house carries a heritage or character constraint.

  • Design and permits usually take 2 to 4 months. Construction on a full home usually takes 4 to 8 months. A heritage review sits in front of both and is the hardest part of it to forecast.

Start with what is protected

Send the address. The first thing we do is find out what the City allows on it, and that conversation costs nothing.