A kitchen is the densest room in the house, and the decisions that set what it costs and how long it takes are made on paper. Almost all of them are about what runs behind the doors rather than the doors themselves.
Planning is the cheap place to change your mind
Where the sink, the hob and the fridge sit decides where the waste falls, which circuits have to be pulled and how much ceiling comes down. Those positions are the cheapest thing to move on a drawing and the most expensive thing to move once the cabinetry is made.
Vancouver housing stock makes that harder than it sounds. A character house in Kitsilano has the charm and a floorplan chopped into small rooms. A postwar bungalow in East Van has the space and none of the services a kitchen now needs.
So the first conversation is about use, not appearance. How many people cook at once. Where the groceries land when you come through the door. What you reach for daily, and what you open twice a year.
When a kitchen needs a permit
New doors and a new worktop usually do not need one. The moment plumbing, electrical circuits or a wall moves, they do, and in a heritage or character area there can be a further review on top of that.
The BC Building Code sets what the rebuilt room has to meet, and the Energy Step Code comes into it once the work reaches far enough. CAS prepares the applications, submits them, and carries them through to the inspections.
The reason to know this at the start is sequencing. An approval that arrives late is an ordinary delay when the kitchen is still standing, and an expensive one when the room is already in a skip.
Where the money actually goes
Everyone asks the price first. The useful answer is that two kitchens with the same footprint are rarely the same job, and five things are what separate them. Three of the five are discovered rather than chosen.
What separates two kitchens of the same size
- How much cabinetry there is
- Usually the largest single line. The length of the runs, the height they reach and whether they are drawn for your walls move the number far more than the door style.
- Whether the services move
- A sink or a dishwasher that crosses the room needs new falls to the drain and new circuits to the wall. Leaving them where they already are is the largest saving on the table.
- Whether a wall comes out
- Joining the kitchen to the room beside it is structural work. That means an engineer in the drawings, a beam in the ceiling and a longer approval before anything is built.
- How the appliances are specified
- Their sizes fix the cabinet drawing, so this is an early decision. It is also the line with the widest range to choose inside.
- What the old kitchen is hiding
- Brittle wiring, tired drains and walls nowhere near square are normal in an older house. They are found when the room opens up, not when it is quoted.
CAS does not publish a price per square foot for a kitchen, and the list above is the reason. A rate that covers a galley with the sink staying exactly where it is, and a rebuild that takes a wall out and moves the plumbing, describes neither of them.
What is worth having instead is a budget written against your room, with cabinetry, stone, appliances, services and labour priced separately. Changing one of them is then a visible decision rather than something quietly absorbed.
Set money aside for what the walls are hiding, and decide in advance that it is only for that. A buffer with no rule attached gets spent on an upgrade, and the rewire behind the old cabinets has nothing left to draw on.
The useful question is not what a kitchen costs. It is how much of yours has to move.

Choosing a layout for the room you have
The layout is the part you live with. A beautiful kitchen with the fridge door opening into the only place to stand and chop is a daily irritation, and no finish fixes it.
- A galley puts two runs facing each other. It is efficient to work in, common in older East Van houses, and the layout most often opened into the room beside it.
- An L-shape frees a wall, which is what makes room for an island or a table. It suits a kitchen that has to be the dining room as well.
- A U-shape gives the most worktop and the most storage for its footprint, and asks for the most care. Get the clearances wrong and it closes in around you.
Which one works is largely decided for you by where the window, the door and the drain already are. The layout is designed around the room you have rather than picked from a catalogue and then forced into it.

Where to spend, and where to stay flexible
Two kinds of decision
The first list is work you pay for twice if you buy it cheaply. The second is the layer where fashion belongs, because it comes off again without touching the building.
Worth the money now
- Cabinet boxes and drawer runners, which carry the weight several times a day
- Hinges and handles, the parts your hands are actually on
- The worktop, which takes the heat, the knives and the water
- Task light over the counter, planned with the circuits
- Extraction ducted to an outside wall instead of recirculating into the room
Easy to change later
- Paint, on the walls and on the cabinet doors
- Pendants and other decorative fittings
- A tiled splashback, provided the wall behind it is sound
- Open shelving, which can go back to doors
- Stools, and anything else not fixed to the building
That split is also how to treat a trend. Warm timber, a quietly veined quartz and a wide island all read well at the moment, and so did the finishes being torn out of kitchens this year. Keep the fashion in the layer you can repaint.
If the work reaches the appliances or the wiring, check what the province currently pays towards. Both the terms and the list of what qualifies change, so it is worth confirming before a rebate is counted as part of the budget.
How long it takes, and what stalls it
There is no published figure for one room, and inventing one would not help you. What CAS does publish is two durations, both of them whole-house, and the first is the one most people leave out of their own estimate entirely.
The two durations CAS publishes
- 2 to 4 months
- Design, planning and permits
- 4 to 8 months
- Construction, full home
Neither of those describes a kitchen on its own. What carries over is the shape of it: design and approvals come before any site work, and they take real time. A single room is shorter to build than a house, and you get a dated schedule for yours before anything is ordered.
What stalls a kitchen is rarely the trades. It is an approval still outstanding, a cabinet run waiting on a signature, or a worktop undecided while the fitter is already on site. Answering quickly is the cheapest schedule control available to you.
Plan for the room being gone, as well. Where the kettle and the microwave live, and what you eat while the sink is disconnected, is far easier to arrange before the strip out than during it.

The decisions that set the outcome
- Plan the storage by what goes in it. Decide where the recycling, the big pans and the small appliances live, and draw the cabinets around that, instead of filling the leftover width with a carousel.
- Treat lighting as part of the layout. Light on the counter where you cut, a softer layer for the room, and both on circuits settled while the walls are still open.
- Fix the appliances early. Their dimensions set the cabinet drawing, so a late change of mind about a fridge or a range is a change to the joinery built around it.
- Consider the next owner even if you are not selling. A sound layout and honest materials are what someone reads first when they walk in, and they are also what you stop noticing in a good way.