A kitchen quote is five unlike things added together, and they do not grow for the same reasons. Knowing which line each of your decisions lands on is worth more than a rate per foot you have no way to check.
Five lines, five different measurements
A kitchen reads as one project and prices as five. Cabinetry grows with the length of the runs. Worktops grow with area. Appliances are a list you fix and then stop thinking about. Services grow with how far anything moves. Labour grows with the order the trades have to come in.
That is why the same floor area produces such different numbers. Two kitchens of identical size can have twice the cabinetry between them, or one can leave the sink exactly where it is while the other sends it across the room.
CAS publishes no price per linear foot and no kitchen band. A linear foot of cabinetry is a real unit of measurement. A linear foot of kitchen is not, because the foot either has a run of drawers and a dishwasher behind it or it has a window.
Cabinetry is measured in runs
Cabinetry is usually the largest single line, and the thing it responds to is length rather than style. Door profile and colour move it far less than most people expect. These are what move it.
- The total length of run, counting the island, which is cabinetry on more than one side
- The height they reach, since a run taken to the ceiling is more carcase, more doors and more scaffold-free fitting time
- Drawers against doors, because a bank of drawers is several boxes and several sets of runners in the width of one cupboard
- What goes inside: a pull-out for the recycling, a pantry fitted out, lighting wired into the units
- Whether the boxes are standard sizes or drawn to your walls, which is the real difference between the price lines you will be quoted
- The finish, last, and the only one of these you can change without redrawing anything
An older Vancouver house complicates this quietly. Walls that are not straight and floors that are not level mean fillers, scribes and packing. A run drawn to a nominal dimension will not fit a room that was built by eye.

Water, load and air
The services are the part of the budget you cannot see when it is finished and cannot avoid when it is wrong. They are also the lines that separate a refit from a rebuild.
Moving water
A sink or a dishwasher that crosses the room needs a new fall to the drain, and sometimes a new vent. In an apartment it also means working around a stack you cannot move. Leaving the waste where it already runs is the largest single saving available in a kitchen.
Adding electrical load
Induction, a wall oven and a kitchen's worth of lighting circuits are load rather than outlets. Whether the existing panel has the capacity is a question to ask before the appliances are chosen. The answer can add a service upgrade to the scope.
Getting the air out
Extraction ducted to an outside wall is the version that works. A recirculating hood puts the steam and the grease back in the room. The route matters as much as the hood, and a powerful one may need make-up air brought in to replace what it throws out.
Cutting two quotes into the same pieces
Two kitchen quotes are only comparable when they are cut into the same pieces. Ask for these six as their own lines, and the comparison takes about ten minutes instead of a week of emails.
Six lines worth seeing apart
- Cabinetry and millwork
- With the length of run, the heights and the internal fittings stated. Without those, the number is unreadable, and it is the line most likely to be the difference between two bids.
- Worktop and splashback
- Material, area, edge detail and whether the splashback is tile or a slab taken up the wall. The slab version is a material decision that lands mostly in labour.
- Appliances and ventilation
- Say plainly who is buying them. A quote that supplies the appliances and one that assumes you will are not the same number, and this is the most common reason two totals look far apart.
- Electrical and plumbing
- Priced apart from each other, with any panel work called out. This is where moving the sink or going to induction shows up, and where it otherwise hides.
- Making good
- Flooring that now runs under the new layout, the ceiling where the old soffit was, and painting the room back. Real work, frequently absent, and awkward to add once the kitchen is in.
- Design, approvals and management
- Drawings, the permit work where the services or a wall move, selections and site supervision. It happens first and it is a line, not an overhead someone absorbs.

Where a kitchen budget leaks
Overspending on a kitchen is rarely one extravagant decision. It is usually four small ones, and all four are avoidable on paper.
- Changing the cabinet line after the drawings are done, which re-prices the whole run rather than the part you changed your mind about
- Moving a service for a gain nobody can describe afterwards, when the plan would have worked with it where it was
- Choosing the appliances late, so the joinery is drawn around dimensions that then change
- Saving on the parts your hands touch daily, such as a hinge or a tap, which get replaced early at a price that includes taking the kitchen apart
The cheapest good kitchen is rarely the plainest one. It is the one where nothing moved that did not need to move.
Before you count a rebate
If the work reaches the appliances or the wiring, it is worth checking what is currently on offer before the budget is set.
BC Hydro's own rebate page lists up to $200 off selected ENERGY STAR appliances. That is their programme and their figure. Both the amount and the qualifying list change, so read it at the source.
Treat anything you find there as a reduction you confirm, never as a line in the budget before you have.
Two pages worth opening next

Before you ask anyone for a price
Fix the appliance list first. Every dimension in the joinery is drawn around it, and the panel question is answered by it, so it is the decision the rest of the kitchen waits on.
Measure the runs, including the heights and the island. A quote priced against a sketch with no dimensions on it is being guessed, whoever wrote it.
Decide whether the sink and the waste are moving, and write down why if they are. It is the largest service variable in the room and the easiest one to talk yourself into.
Have both quotes priced on the same drawing and the same appliance list. Two kitchens quoted from two conversations cannot be compared, and the gap between them tells you nothing.
Any change you are weighing up lands on one or two of the five lines, almost never on all of them. Which is why the itemised version is worth asking for even when you trust the total: it tells you what a change costs before you commit to it.