How much of the house is moving? That is the question a renovation price answers to, and it has two halves: the work you choose, and the work the house turns out to need. Only the first can be settled at a table.
Why one figure cannot answer this
The honest first answer to what it costs is a question back. How much of the house is moving? New doors on the kitchen and a main floor stripped to the studs are the same word and not remotely the same job.
CAS publishes no price per square foot and no band for a house. A rate is an average of other people's buildings, and the averaging is where the information goes. Two houses on the same street, with the same rooms on the list, can land a long way apart before anyone has chosen a tile.
What can be set out in advance is where that distance comes from, and which part of it you are holding the pen on.
Chosen scope, and discovered scope
Every line in a renovation budget belongs to one of two sets. The first is decided at a table before anything is touched. The second is written by the house, usually in the first fortnight on site, and it is the reason a published rate cannot be honest.
Two sets of decisions
The left column is yours to move, and moving it early is free. The right column is found, and the only thing you control about it is whether the budget had room for it.
Decided by you
- Which rooms are in the scope, and whether the ones left out stay usable while work runs
- Whether any wall moves, which brings an engineer into the drawings and lengthens the approval
- The level the specification is set at, from the flooring to the door handles
- Whether the services are renewed throughout or only where a wall is already open
- Whether you stay in the house during construction or move out, which changes the programme as well as your costs
Decided by the house
- The state of the wiring, and whether the panel carries what you are adding to it
- Drains and supply lines that turn out to be at the end of their life once they are exposed
- Framing that is out of plumb, notched through for a pipe, or carrying more than it was built to
- Hazardous material in old finishes, which brings its own survey and its own route off site
- What the current code asks of anything you touch, which is often more than what is there now
An older house in Vancouver rarely produces a surprise from that right-hand column. It produces two or three, and which ones is a matter of the decade it was built in rather than luck.

The local weight on a budget
Skilled trades across the Lower Mainland are busy, and labour is usually the largest share of a renovation rather than the materials people picture. That is a market condition, not a line you can negotiate away.
The approvals are the other local weight. Each municipality runs its own process, a character or heritage area can add a review on top, and the Energy Step Code sets what the rebuilt parts have to reach. None of that is optional and all of it takes calendar time.
Then there is the housing stock. Much of what gets renovated here was built before the services a modern house runs on, which is what fills the discovered column above.
Where one number hides the answer
Two quotes are comparable only when they are broken into the same parts. One number for the whole house tells you what somebody is willing to charge. It does not tell you what they have allowed for, which is the thing you are actually trying to find out.
The lines worth seeing separately
- Design, engineering and approvals
- Drawings, structural input and the permit work. It happens before site work and carries its own fees, so a total that leaves it out is not the cost of the project.
- Strip out and disposal
- Taking the old house apart is labour and bins. Older finishes can need a survey first and a licensed route off site after, which is a cost of the demolition rather than a surprise.
- Structure
- Beams, posts and foundation work, priced from the engineer's drawings. Where it appears as an allowance instead, ask what the allowance assumes and what happens if the drawings ask for more.
- Services, by trade
- Electrical, plumbing, heating and ventilation priced apart from each other. This is where renewing beyond the opened walls either shows up or quietly does not.
- Finishes, by trade
- Flooring, tiling, millwork, painting and the fittings. Before selections are made these are allowances, which is normal, and each one should say so on the page.
- Supervision, protection and the clean
- Site management, protecting what stays, access and scaffolding, and the clean at the end. All real money, and the group most often left unwritten.
Ask for the provisional lines to be labelled, with the assumption beside each. When a selection lands above its allowance, you then see which line moved and by how much. The alternative is a revised total with no way back to the old one.
The lines not to look for a saving in are the ones you cannot reach again without undoing finished work: structure, waterproofing, and anything buried in a wall. The visible layer is where a cheaper decision stays reversible.
Money set aside for the discovered column is not spending money. Give it a rule before site work starts, in writing if you like, that it pays for what the house turned out to need and nothing that was a choice.

All at once, or room by room
Doing the work in one pass means one set of drawings, one approval, one mobilisation and one period of living with it. Phasing spreads the money over years, which is why people choose it, and repeats some of those fixed costs each time.
The decision usually comes down to whether you can live in the house while it happens and what the cash will allow. Both are legitimate answers. What is not legitimate is phasing a design, because the kitchen built this year has to work with the floor plan you reach in three years.
So design the whole, then build it in parts if that is what the budget says. Sequencing the services matters most: a circuit or a drain that has to be reopened to serve the next phase is work paid for twice.
Phasing changes when you pay, not what the work costs. What it does change is how many times you pay to set up, protect and clean the same house.
If the answer is the whole house
How long it takes, and why that is a cost
Time is a budget line even when it is nobody's fault. Somewhere else to live, finance held open longer, and decisions kept waiting all have prices attached. CAS publishes two ranges and plans against them.
The two ranges CAS publishes
- 2 to 4 months
- Design, planning and permits
- 4 to 8 months
- Construction, full home
The first of those is the stage people leave out of their own estimate entirely, and it is the stage where changing your mind is still free. The second describes a whole house; a single room is a shorter build than that, and yours gets a dated schedule before anything is ordered.
What stalls a project is rarely the trades. It is an approval still outstanding, a selection still open, or a long-lead item ordered after the wall it belongs to was closed. Answering quickly is the cheapest schedule control a homeowner has.

Where a number stops being a guess
- Write the scope down room by room, including the rooms you are not touching. A renovation grows at its edges, and the edges are where the unbudgeted work gets agreed verbally on site.
- Decide early whether you are staying in the house. It changes the sequence, the protection, the programme and what you spend outside the contract, and it is awkward to change once work has started.
- Set the specification level before you ask for prices, even roughly. Pricing a scope whose finishes are undecided produces a number that moves the moment you choose anything.
- Have the same scope priced twice, itemised the same way. Where two quotes differ by a lot on one line, that line is where somebody has either understood the house or not looked at it.
A figure given before these exist describes a project nobody has defined yet. Each one closes off a way for the number to move later, which is the whole reason they come first.

